home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / pc / text / spacedig / v13_0 / v13_094.txt < prev    next >
Internet Message Format  |  1991-06-28  |  17KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from hogtown.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/kbdy:Ga00WBwA2GU5r>;
  5.           Thu, 31 Jan 91 04:25:38 -0500 (EST)
  6. Message-ID: <sbdy-CK00WBw42Ek5z@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Thu, 31 Jan 91 04:25:34 -0500 (EST)
  12. Subject: SPACE Digest V13 #094
  13.  
  14. SPACE Digest                                      Volume 13 : Issue 94
  15.  
  16. Today's Topics:
  17.     What the Shuttle is good for (was: Re: Why man rate?)
  18.               Magellan Update - 01/25/91
  19.     Re: Why man rate? (was: space news from Dec 17 AW&ST)
  20.            Re: space news from Dec 17 AW&ST
  21.           Re: Commercial Space News (4 of 4)
  22.     Re: Why man rate? (was: space news from Dec 17 AW&ST)
  23.               Re: More on space cameras
  24.     Re: Why man rate? (was: space news from Dec 17 AW&ST)
  25.  
  26. Administrivia:
  27.  
  28.     Submissions to the SPACE Digest/sci.space should be mailed to
  29.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription requests,
  30.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  31.              tm2b+@andrew.cmu.edu
  32.  
  33. ----------------------------------------------------------------------
  34.  
  35. Date: 25 Jan 91 20:21:29 GMT
  36. From: sdd.hp.com!elroy.jpl.nasa.gov!freedom!cornutt@ucsd.edu  (David Cornutt)
  37. Subject: What the Shuttle is good for (was: Re: Why man rate?)
  38.  
  39. v071pzp4@ubvmsd.cc.buffalo.edu (Craig L Cole) writes:
  40.  
  41. >If we don't learn to operate shuttles, we'll be lauching atop ELVs
  42. >forever. The NASP program wouldn't exist either. The shuttle isn't
  43. >what it was expected to be, but it still is a major step in the
  44. >right direction.
  45.  
  46. That's one of my points.  Saying that we'll rely on ELV's into the
  47. indefinite future is shortsighted at best, and shortsightedness has
  48. been one of our biggest problems in space program planning.  (By "we",
  49. I mean the whole country.)
  50.  
  51. >What is true, is that the shuttle, being the expensive vehicle it is,
  52. >is being used for what it is best at -- life sciences, micrograv
  53. >research, delicate deploys, etc. No more run-of-the-mill satellite
  54. >deploys. They SHOULDN'T be launched via the shuttle. Its not only
  55. >cheaper to do it with ELVs, but it takes away from true sciences
  56. >and experiments only the shuttle can perform.
  57.  
  58. I'll buy that.  Someday, spaceplanes will probably perform *all*
  59. satellite deploys, but the current vehicle costs too much too
  60. operate for that.  Keep the Shuttle for science missions, free
  61. fliers, fetch-and-retrieve missions, and precision shots such
  62. as plantaries.  (One vastly unappreciated capability of the
  63. Shuttle is its precision to perform precision launches which are
  64. so important for planetary probes, to help them conserve precious
  65. thruster fuel, and their ability to perform on-orbit checkout of
  66. these one-of-a-kind probes and bring them back if a problem is
  67. found.)
  68.  
  69. Looking at the current manifest, it appears to be moving in the
  70. right direction.  The main thing that I would do, still, is get
  71. the TDRS launches onto an ELV.  Then, maybe there would be a
  72. chance for an Astro-2.
  73.  
  74.  
  75. -- 
  76. David Cornutt, New Technology Inc., Huntsville, AL  (205) 461-6457
  77. (cornutt@freedom.msfc.nasa.gov; some insane route applies)
  78. "The opinions expressed herein are not necessarily those of my employer,
  79. not necessarily mine, and probably not necessary."
  80.  
  81. ------------------------------
  82.  
  83. Date: 25 Jan 91 21:15:28 GMT
  84. From: swrinde!elroy.jpl.nasa.gov!jato!mars.jpl.nasa.gov!baalke@ucsd.edu  (Ron Baalke)
  85. Subject: Magellan Update - 01/25/91
  86.  
  87.  
  88.                          MAGELLAN STATUS REPORT
  89.                            January 25, 1991
  90.  
  91.      The Magellan spacecraft and its radar system continue to perform
  92. nominally.  All STARCALS (star calibrations) and DESATS (desaturations) of
  93. the past 24 hours were successful with four foreground star rejects.  The
  94. attitude updates ranged from 0.017 to 0.030 degrees.
  95.  
  96.      The spacecraft controllers are predicting an increase in the number of
  97. background rejects over the next few days due to solar flare activity.
  98.  
  99.      Late today the mapping command sequence M1026 will be sent to the
  100. spacecraft, along with the associated parameter files.  This 4-day sequence
  101. returns Magellan to its non-occulted mapping mode.  It is for 4 days rather
  102. than 8 days because of the return to the normal Tuesday upload next week.
  103.  
  104.      On Monday, 28 January, commands will be sent to perform the first of
  105. several in-flight tests on the DMS-A (Data Management Subsystem-A).  These
  106. tests are designed to determine the cause of the tape recorder deterioration,
  107. with the hope that corrective actions could restore it to partial use.
  108.       ___    _____     ___
  109.      /_ /|  /____/ \  /_ /|      Ron Baalke         | baalke@mars.jpl.nasa.gov
  110.      | | | |  __ \ /| | | |      Jet Propulsion Lab | 
  111.   ___| | | | |__) |/  | | |___   M/S 301-355        | It's 10PM, do you know
  112.  /___| | | |  ___/    | |/__ /|  Pasadena, CA 91109 | where your spacecraft is?
  113.  |_____|/  |_|/       |_____|/                      | We do!
  114.  
  115. ------------------------------
  116.  
  117. Date: Sat, 26 Jan 91 20:46:39 -0500
  118. From: "Allen W. Sherzer" <aws@iti.org>
  119. Subject: Re: Why man rate? (was: space news from Dec 17 AW&ST)
  120. Newsgroups: sci.space
  121. Cc: 
  122.  
  123. In article <1991Jan25.200639.16712@freedom.msfc.nasa.gov>:
  124.  
  125. >>We use Soyuz. We mount it on a Delta for 20% the cost of a Shuttle
  126. >>flight. We could also put it (and 50K to 100K pounds extra payload)
  127. >>on a Delta or Titan derived HLV for half the cost of a Shuttle flight.
  128.  
  129. >Are you saying that you could design a Titan with 130-150K lb payload
  130. >capacity?
  131.  
  132. Me? No. But Martin Marrietta can. They and McDonnald Douglas offered
  133. to build heavy lift versions of the Titan and Delta several years ago
  134. as part of the SDIO Zenith Star program. For details see:
  135.  
  136. 1. Zenith Star Launch Vehicles in Aerospace America, (I think) June
  137.    1990.
  138. 2. Launch Options for the Future: A Buyers Guide by the Office of
  139.    Technology Assessment
  140. 3. A few articles in Avation week in 87. Look under Zenith Star
  141.    in the readers guide.
  142.  
  143. >There's no way that it could ever be man-rated.  
  144.  
  145. Nonsense. The vibration load is acceptable and it is just as
  146. safe as the Shuttle. If you are going to send people on the Shuttle
  147. there is no reason they couldn't go on a Titan IV or V (unless you
  148. get off on wasting money).
  149.  
  150. >You can't go on adding thrust to a vehicle forever. 
  151.  
  152. I didn't say you could. I just said you could put up 100K to 150K
  153. pounds with it.
  154.  
  155. >>That's the problem. We double the cost of everything to get 0.01%
  156. >>more safety out of it. It's just not worth it.
  157.  
  158. >Actually, I agree with you.  But Congress and the American public
  159. >don't agree.  In their minds, 0.01% risk is not acceptable for
  160. >a manned vehicle.
  161.  
  162. I'm glad you agree. As to Congress, many of them are very willing
  163. to accept what we agree on: ELV's are just as safe as the Shuttle
  164. so the lack of 'man rating' shouldn't stop us from saving tens of
  165. millions by using them.
  166.  
  167.  
  168.     Allen
  169.  
  170. -- 
  171. +-----------------------------------------------------------------------------+
  172. |Allen Sherzer |A MESSAGE FROM THE ANTI-WAR MOVEMENT TO THE PEOPLE OF KUWAIT: |
  173. |aws@iti.org   |       "If rape is inevitable, enjoy it!"                     |
  174. +-----------------------------------------------------------------------------+
  175.  
  176. ------------------------------
  177.  
  178. Date: 25 Jan 91 21:00:48 GMT
  179. From: idacrd!mac@princeton.edu  (Robert McGwier)
  180. Subject: Re: space news from Dec 17 AW&ST
  181.  
  182. From article <1991Jan24.172212.6071@freedom.msfc.nasa.gov>, by cornutt@freedom.msfc.nasa.gov (David Cornutt):
  183. > aws@ITI.ORG ("Allen W. Sherzer") writes:
  184. >>The public will accept risk if given an accurate assessment of the risks.
  185. > I realize that this is getting way off the thread here, but IHMO this
  186. > statement is fundementally untrue.  Today's American public will accept
  187. > NO RISK WHATSOEVER, no matter how small, if it is not something that
  188. > David Cornutt
  189.  
  190.  
  191.  
  192. I basically agree with David.  This is partially a result of a really basic
  193. mistrust of authority, and a unbelievable set of liability laws and common
  194. law and how it is practiced in the U.S.  Many blame the Vietnam era and too many
  195. lawyers for most of the trouble, IMHO, there is SOME truth in this.
  196.  
  197. The very thought of someone in (say) Germany suing Daimler-Benz for hundreds
  198. of millions of DM and winning because of a nut and bolt which failed, NOT
  199. becuase of negligence, but because nothing made by man is perfect, is too
  200. ludricrous for me to believe could happen.  Can anyone think of a country
  201. other than the US that is totally and completely unwilling to take risks
  202. in `daily life' as part of the price of `modern civilization'?
  203.  
  204. Bob
  205.  
  206. -- 
  207. ____________________________________________________________________________
  208.     My opinions are my own no matter    |    Robert W. McGwier, N4HY
  209.     who I work for! ;-)            |    CCR, AMSAT, etc.
  210. ----------------------------------------------------------------------------
  211.  
  212. ------------------------------
  213.  
  214. Date: 26 Jan 91 04:35:31 GMT
  215. From: zaphod.mps.ohio-state.edu!sdd.hp.com!elroy.jpl.nasa.gov!zardoz.cpd.com!dhw68k!ofa123!Wales.Larrison@tut.cis.ohio-state.edu  (Wales Larrison)
  216. Subject: Re: Commercial Space News (4 of 4)
  217.  
  218. the first significant win for that entrepreneurial startup, and 
  219. should allow them to see some positive contractual cash flow for the 
  220. first time in several years.  However, they have never successfully 
  221. performed an orbital flight, or tested their 4-stage version of the 
  222. Conestoga, so they will have a tough time to get the system proven 
  223. and ready for flight in 18 months.   This may stretch their funding 
  224. to the limits - particularly as they seem to be taking this as a 
  225. loss-leader in the expectation of future business in this area.] 
  226.           
  227. COMMERCIAL LAUNCH FIRMS SET LAYOFF DUE TO MARKET DECLINES 
  228.    All three of the major U.S. commercial launch firms have set 
  229. employee layoffs due to slowing production rates of their rockets.  
  230. McDonnell Douglas Space Systems Company (Delta), General Dynamics 
  231. Space Systems (Atlas), and Martin Marietta's Astronautics Group 
  232. (Titan) have all recently announced layoffs.  MDSSC said this week 
  233. it laying off about 300 employees.  GDSS said it will reduce its 
  234. work force through attrition and layoffs by 500, and Martin Marietta 
  235. Astronautics also cutting some jobs related to the Titan booster 
  236. program (specific number was not announced).  
  237.    Both MDSSC and GD specifically cited the cuts as being mainly due 
  238. to a reduction in the number of launch contracts expected over the 
  239. next few years.  In GD's case, they were very vulnerable to 
  240. reductions in DoD funding which had provided a major portion of 
  241. their commercial launch services business.  MDSSC last year launched 
  242. 11 commercial payloads last year (primarily DoD GPS satellites), but 
  243. after launching 1 Delta this year, has only another 4 commercial 
  244. payloads remaining on their manifests. .  
  245.    [Commentary: From my last count there were about 80 planned 
  246. commercial orbital launches over the next 5 years.  This split 
  247. approximately 50/50 between the Ariane and the U.S., with a few 
  248. going to China's Long March.  Furthermore, the expected number in 
  249. the near-term is expected to decline as much of the current market 
  250. is replacements for the previous generation of GEO satellites, and 
  251. once the constellations are replenished, they will probably not be 
  252. replaced for another decade.  Similarly, the commercial contracts 
  253. for DoD launches were driven by the Reagan era funding, and many of 
  254. these satellite constellations are also nearing completion. 
  255. Competition for this market is intense, and given that there are 3 
  256. U.S. manufacturers vying for the same market there have been some 
  257. doubts raised as to whether the existing launch market can support 
  258. all three major U.S. ELV competitors. 
  259.    These problems have been compounded with recent problems at a 
  260. couple of the parent firms. GD and McDonnell have had to take large 
  261. losses when the A-12 was cancelled, plus their expected business 
  262. base has declined substantially as the DoD budget plans have 
  263. declined.  McDonnell is under particular financial strain, and there 
  264. has even been speculation in Forbes and Av Week about their ability 
  265. to continue to operate - although this is dependent upon all of 
  266. their major programs having serious and unforseen problems.] 
  267.  
  268. --------------------------------------------------------------------
  269. Wales Larrison                          Space Technology Investor 
  270.  
  271. [I apologise for breaking this up into several message.  The gateway 
  272. I use only allows messages of 60 lines or less.]
  273.  
  274.  
  275.  
  276.  
  277. --  
  278. Wales Larrison
  279. Internet: Wales.Larrison@ofa123.fidonet.org
  280. Compuserve: >internet:Wales.Larrison@ofa123.fidonet.org
  281. --------------------------------------------------------------------------
  282.  
  283. ------------------------------
  284.  
  285. Date: 25 Jan 91 21:09:35 GMT
  286. From: idacrd!mac@princeton.edu  (Robert McGwier)
  287. Subject: Re: Why man rate? (was: space news from Dec 17 AW&ST)
  288.  
  289. From article <YAMAUCHI.91Jan25005817@heron.cs.rochester.edu>, by yamauchi@cs.rochester.edu (Brian Yamauchi):
  290. > In article <9101250025.AA14284@iti.org> aws@ITI.ORG ("Allen W. Sherzer") writes:
  291. >    There is no need to ask them. We HAVE sent people up on Delta's. Funny
  292. >    how they managed to make it do something it was never intended to do :-).
  293. >
  294.  
  295.  
  296. It is difficult for me to tell who said what above so I have included both
  297. references.  NAME ONE manned launch that was done with a Delta.
  298.  
  299. Bob
  300.  
  301. -- 
  302. ____________________________________________________________________________
  303.     My opinions are my own no matter    |    Robert W. McGwier, N4HY
  304.     who I work for! ;-)            |    CCR, AMSAT, etc.
  305. ----------------------------------------------------------------------------
  306.  
  307. ------------------------------
  308.  
  309. Date: 26 Jan 91 00:20:39 GMT
  310. From: usc!julius.cs.uiuc.edu!ux1.cso.uiuc.edu!news@apple.com  (Doug McDonald)
  311. Subject: Re: More on space cameras
  312.  
  313.  
  314. In article <1991Jan25.202543.19020@freedom.msfc.nasa.gov> cornutt@freedom.msfc.nasa.gov (David Cornutt) writes:
  315. >Thanks for a fine article, Charles.  A couple of questions?
  316. >
  317. >(1) Does exposure to vacuum effect film?  (Apart from the thermal problem)
  318.  
  319. Yes, but very slowly. Generally speaking it decreases reciprocity
  320. failure. For ordinary exposures less than 1/5 second, it has little 
  321. effect on most films. At room temperature it takes days to do much.
  322.  
  323.  
  324. Doug McDonald
  325.  
  326. ------------------------------
  327.  
  328. Date: Sat, 26 Jan 91 20:12:57 -0500
  329. From: "Allen W. Sherzer" <aws@iti.org>
  330. Subject: Re: Why man rate? (was: space news from Dec 17 AW&ST)
  331. Newsgroups: sci.space
  332. Cc: 
  333.  
  334. In article <1910@ksr.com> Chris Jones writes:
  335. >The effort to man-rate the Atlas was non-trivial.  In fact, the original Atlas
  336. >failed in its first flight with a Mercury on top of it, and quite a bit of
  337. >effort went into beefing up its structure and adding redundancy.  
  338.  
  339. I don't doubt that is true. I also don't doubt that is was needed to make
  340. it safe enough for people. But the Atlas of today is far far more reliable
  341. than the Atlas of 30 years ago.
  342.  
  343. The Atlas of today is just as safe as the Shuttle. Given that, what reason
  344. is there not to use is for humans? If two launchers have identical operational
  345. safety records, how can one be considered safe and the other not?
  346.  
  347. >In fact, the Titan uses the
  348. >exact opposite of the Shuttle's ignition strategy...  It takes off under solid
  349. >propulsion only, and doesn't ignite its liquid fuelled engines until some time
  350. >has passed.
  351.  
  352. Given that both put their payloads in orbit 97%+ of the time I don't see
  353. that that is a big deal. However, I can think of two solutions:
  354.  
  355. 1. Change the sequence by firing the liquid engines at 10% thrust and
  356.    keeping them on.
  357.  
  358. 2. Put an escape tower on the capsule (there will be one anyway). If the
  359.    liquid engine fails to ignite, punch out.
  360.  
  361. But as I said, anybody who is afraid to fly in one should also be afraid
  362. to fly in the other since both are equally safe.
  363.  
  364.   Allen
  365.  
  366.  
  367. -- 
  368. +-----------------------------------------------------------------------------+
  369. |Allen Sherzer |A MESSAGE FROM THE ANTI-WAR MOVEMENT TO THE PEOPLE OF KUWAIT: |
  370. |aws@iti.org   |       "If rape is inevitable, enjoy it!"                     |
  371. +-----------------------------------------------------------------------------+
  372.  
  373. ------------------------------
  374.  
  375. End of SPACE Digest V13 #094
  376. *******************
  377.